Saturday 2 June 2012

Building the Beacon!

Building up a strong base of pallets

Filling up the centre with brash.

Tuesday saw the TTF build the Jubilee Beacon on Hazler Hill. A ring of pallets was built up with the aid of the tractor once it was too high for the volunteers to lift them on themselves. The middle was filled with brash and other waste wood ready to be lighted on Monday night at 10.26.
Building up the sides.
More waste wood in the centre.
Using the tractor to put pallets on top.

No comments:

Post a Comment